PlayMEX
Flowlineの作品画像

GAME DETAIL

Flowline

種別:ゲーム 発売日:2027年3月8日 日本語対応未確認
価格未定

Don't build more — make it flow. An idle factory game where one station always limits your line. Find it, feed it, and watch the bottleneck jump somewhere new. Secretly a real manufacturing simulation — with none of the math in your face.

このゲームについて

Steamの詳しい説明を読む

Don't build more — make it flow.

Flowline is a clean idle factory game where the satisfaction isn't building more — it's making the line flow. You find what's choking your factory, feed it, smooth out the chaos, and watch a stuttering, stalling production line turn into a smooth, humming river of goods and cash.

The hook: the bottleneck moves
At any moment, one station limits your whole factory. Feed it, and the line speeds up — then the constraint jumps somewhere new. Chase it, fix it, watch it move. That's the loop.

Secretly a real factory simulation
Under the hood, Flowline runs the actual science of manufacturing operations — Theory of Constraints and the queueing laws of production flow: throughput, work-in-progress, variability, machine uptime (OEE), pull/Kanban scheduling, quality and yield. But there's no math in your face. The equations run the world; you just feel the result.

Want the numbers? Flip on the optional engineer's overlay and every real figure is there — cycle time, WIP, OEE, variability. Most players never need it. Industrial engineers will recognize an old friend.

What you'll do

Find the constraint and feed it — stop wasting money upstream []Buffer the chaos — tame variability with the right amount of WIP, not the most []Keep machines healthy — preventive maintenance vs. run-to-failure []Switch push to pull — discover why just-in-time beats overproduction []Improve forever — prestige as Kaizen: bank permanent, learned best practice []Scale up — connect plants into a supply network where the bottleneck can live in another factory, or in the road between them
Challenge Mode — 18 puzzles, eight chapters
A broken plant, a deadline, and one right answer. Each puzzle is a real diagnosis: capacity, variability, batching, sourcing, market limits, flow time. Every one is proven solvable — and proven resistant to the obvious wrong fix — by an automated suite before it ships.

Checked against the textbook
The simulation's throughput and WIP behaviour is measured against Hopp & Spearman's Best-Case and Practical-Worst-Case bounds in a test suite that runs on every code change. It beats Practical Worst Case by 17–24%, exactly as its own measured variability predicts. If you teach or study operations, the numbers are honest enough to point at.

Idle-friendly: it runs while you're away, with offline progress.

Inspired by Capitalism, Factorio, and The Goal.

STEAM USER TAGS

ユーザータグ

ATTENTION

注目度メトリクス

現在プレイヤー数 未集計 最終観測:未集計
Steamフォロワー数 1人 最終観測:2026年9月14日 11:17(13日経過)

プレイヤー推移

データ蓄積中 24時間平均

選択した期間に観測データはありません。

Steamフォロワー推移

2件以上で集計 直近7日

選択した期間に観測データはありません。

プレイヤー数とフォロワー数は意味と単位が異なるため、 別々の時系列として表示しています。補間した値は使用していません。

発売前注目度の基礎指標 発売前タイトルのため、Steamフォロワー数と7日増加を中心に注目度を観測します。

指標 現在値 観測状況
現在プレイヤー数 未集計 最終観測:未集計
24時間ピーク データ蓄積中 未集計・直近7日 0件
Steamフォロワー数 1人 最終観測:2026年9月14日 11:17(13日経過)
7日フォロワー増加 2件以上で集計 履歴あり・更新待ち・直近7日 0件

PlayMEXが保存した観測値です。取得時刻と観測数を あわせて確認できます。

ジャンル・機能

機能カテゴリ

SteamクラウドSteam実績ファミリーシェアリング

ゲームライフログ

所有ゲームとして同期されると、 このゲームの記録を残せます。

基本情報

発売日
2027年3月8日
価格
価格未定
価格区分
未確定
開発元
Ashley Goad
販売元
Ashley Goad
対応OS
Windows
コンテンツ種別
ゲーム

対応言語

言語 対応 フル音声
日本語 — —
英語 ○ —

Steamの保存済み情報から 2言語を確認できます。

自分の実績進捗

未同期

Steamでログインすると、このゲームの実績解除率や 最近解除した実績を表示できます。

Steamでログイン

あなたのゲーム情報

Steamでログインすると、所有状況、プレイ時間、 ライフログを表示できます。

トップからSteamログイン

STEAM USER TAGS

Flowlineのユーザータグ

変更内容が保存されていません

このまま移動すると、入力した内容が失われます。